If your scope on a CHIPS-funded project includes construction, alteration, or repair work — including construction performed as part of equipment installation, which brings the entire project under DBRA — pay prevailing wages and submit certified payrolls weekly for every week work is performed, each with a Statement of Compliance; this applies to contractors and subcontractors alike. (Delivery-only scope: confirm against 29 CFR 5.2 material-supplier rules.)
az-regulatory §Davis-Bacon on CHIPS-funded work
- When it applies
- Hookup/installation contractors and their subs on CHIPS-funded sites.
- Evidence you'd show
- Payroll export, Attestation
- How often
- Weekly
- If it isn't met
- Back wages, liquidated damages, debarment.
az-regulatory v1 §Davis-Bacon on CHIPS-funded work — verify against the source
Verified against source on 2026-09-07 · Source version: 2026 calendar
Verify against the source — requirements change.
https://www.nist.gov/system/files/documents/2024/02/08/Davis-Bacon%20and%20Related%20Acts%20101%20and%20FAQ.pdf